Skip to Main Content

Jalisco Logistics Center

SALE OF INDUSTRIAL MACROLOTES

Strategically located only 25 minutes from the Metropolitan Area of Guadalajara, the Jalisco Logistics Center (CLJ) is one of the most important industrial developments in the country, designed to meet the needs of the light, heavy and logistics industry in a multimodal, modern and competitive environment.
Its connection with the port of Manzanillo, two international airports (Guadalajara and Puerto Vallarta), a railway network operated by Ferromex, and the macrolibration, CLJ offers unique logistics advantages for companies with national and international operations.
This industrial park has a first level infrastructure, including roads for heavy traffic, wastewater treatment plant, redundant supply of electric power, natural gas availability, water, 24/7 safety, and lot services.
Currently, more than 35 companies already operate within the park and continue to add new projects thanks to the availability of more than 478 hectares for development.
With a qualified workforce, close to urban centers and services, and a customs scheme in the process of authorization, CLJ represents one of the best industrial opportunities in the west of the country.

Jalisco Logistics Center Location

Free Road Acatlán de Juárez A Cd. Guzmán Km 11, Jal 401, 45713, Acatlán de Juárez, Jalisco
Immediate environment:
  • 15 minutes from macrolibration
  • 25 minutes from Guadalajara Metropolian Zone
  • 35 minutes from southern peripheral
  • 60 minutes from Guadalajara International Airport
Instructions to get using Google MAPs or using Waze

Industrial lots

Proposals for industrial lots available for sale:
  • # - surface - precio
  • own#1 - 48,631 m.2 - $3,161,058 USD
  • own#2 - 225,275 m.2 - $14,642,912 USD
  • own#3 - 30,453 m.2 - $1,979,485 USD
  • own#4 - 10,000 m.2 - $750,000 USD
  • own#5 - 125,748 m.2 - $10,059,886 USD

Master Plan

Four phases with +1,155 hectares of industrial terrain with first -level lot services.
For the light and heavy industry.
35 companies in operation and 10 under construction.
With services capacity for large users.

URBANIZATION:

WATER

  • Pozo with capacity of 1,200,000 m³
  • Titles for 1.5 million mission of support
  • Lagunas aquifer with availability for large users
  • Water storage tank
  • Superficial and piped storm drainage

Wastewater treatment plant

  • Wastewater treatment plant (PTAR - biological)
  • The entire volume of wastewater is conducted to the wastewater treatment plant, located in the northwest section of the Industrial Park.
  • The first phase has a recovered water capacity of 10 lps. Engineering and initial works leave everything ready to increase capacity at 40 LPS

Electricity

  • Internal medium voltage distribution
  • CLJ has one of the most robust energy systems in the country
  • CLJ's electrical substation is redundant in 69 kV
  • The medium voltage electric power supply in CLJ is supplied by two substations
  • Including a high -power substation, located 9 km from CLJ with 1,450 MVA's power
  • The internal substation has 2 30 MVA’s transformers each, adding a total of 60 MVA's

Natural gas

  • CLJ has all the infrastructure to provide natural gas to companies, thanks to a specialized and experienced supplier in the field.

Railway

  • Operated by Ferromex
  • Located on the Manzanillo - Guadalajara road
  • 2 km length built
  • 3 internal spurs

Customs section

  • The Customs Section, administered by the ANAM, is expected to obtain the corresponding permits in 2025
  • The project will provide, simplify and automate the customs office, which will favor foreign trade for CLJ users

For more information

Allow an advisor to contact you more information and clarify any questions, simply filling this form:
Please type your full name here.
Please check that your email is well written.
Please check your cell phone number.
INVALID INPUT

* Indicates Required data

Personalized advice

Asesoria Personalizada

Asesoria Personalizada

Asesoria Personalizada